Only current base-job levels ready for player use are shown.

Verified Pal and base-job lookup
Palworld Work Suitability Database
Choose the base job that is failing, filter by minimum Work Suitability level, then compare specialists with flexible workers. Use the shortlist to change one Pal and watch a complete production cycle before changing layout or staffing again.
Filter a failed base job instead of reading one long Pal list.
Rank, passives, facilities, food, layout, and settings can change real output.
Useful when task switching is the problem, not automatically best in every base.
Simple database query
Choose the base job that is failing
Pick a job and minimum base level. The database shows only Pals that can perform it, with their other verified jobs beside it.
The highest verified level identifies the first job to test, not a universal throughput winner.
Other verified jobs show where a Pal can be useful after the measured bottleneck is stable.
Every row points to the next input, path, storage, or station check before you replace a worker.
Three staffing decisions
Level is only useful after the job is named
These records demonstrate why the database separates specialist, focused, and flexible workers. The right choice changes with the failed lane and the cost of losing a worker to another task.
Specialist: protect one critical lane
Aegidron is recorded only for Mining at level 8. That narrow role is useful when ore or stone is the measured bottleneck and task switching would be a bigger problem than coverage.
Test: Assign it to the mining lane, then verify the node and storage handoff before changing the Pal.Focused worker: lead with the highest lane
Bastigor leads with Cooling at level 8, while Lumbering 6 and Mining 5 remain fallback jobs. It can cover a quiet base, but priorities should keep the cooling station from losing the worker.
Test: Set Cooling as the active priority and keep the lower jobs available only when the main station is quiet.Flexible worker: coverage creates a trade-off
Dandilord reaches level 8 in Planting but covers five lanes. That breadth is useful during a changing base, yet it also makes the Pal easy to pull away from the measured plot or resource chain.
Test: Use work priorities and confirm seeds, space, watering, and output before treating its level as the solution.| Pal | Best verified job | All verified base jobs | Assignment decision |
|---|---|---|---|
Aegidronspecialist | MiningLevel 8 | Mining 8 | Lead: Assign Mining when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for ore or stone production at the measured resource lane; it has no lower-priority job to pull it away. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Bastigorfocused | CoolingLevel 8 | Cooling 8Lumbering 6Mining 5 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 8; keep Lumbering 6 and Mining 5 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Celesdir Noctfocused | LumberingLevel 8 | Lumbering 8Gathering 4 | Lead: Use Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering at level 8; keep Gathering 4 as a fallback only when the main lane is quiet. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Dandilordflexible | PlantingLevel 8 | Planting 8Handiwork 6Medicine Production 6Gathering 5Transporting 3 | Lead: Use Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Planting at level 8; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Planting still stalls, check the plot has seed input, reachable space, and a connected watering route before replacing the Pal or raising its level. Next: Watch one planting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Jetragonspecialist | GatheringLevel 8 | Gathering 8 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Orserkfocused | Generating ElectricityLevel 8 | Generating Electricity 8Transporting 4Handiwork 3 | Lead: Use Generating Electricity as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity at level 8; keep Transporting 4 and Handiwork 3 as a fallback only when the main lane is quiet. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Renjishiflexible | KindlingLevel 8 | Kindling 8Handiwork 6Gathering 5Transporting 5 | Lead: Use Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling at level 8; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Shaolongfocused | WateringLevel 8 | Watering 8Gathering 5 | Lead: Use Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Watering at level 8; keep Gathering 5 as a fallback only when the main lane is quiet. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Silvanceflexible | Medicine ProductionLevel 8 | Medicine Production 8Handiwork 6Planting 6Gathering 4Transporting 2 | Lead: Use Medicine Production as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Medicine Production at level 8; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Medicine Production still stalls, check the recipe inputs are present and the medicine output has somewhere to go before replacing the Pal or raising its level. Next: Watch one medicine queue cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Solennefocused | HandiworkLevel 8 | Handiwork 8Gathering 4Transporting 2 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 8; keep Gathering 4 and Transporting 2 as a fallback only when the main lane is quiet. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Astegonfocused | MiningLevel 7 | Mining 7Handiwork 3 | Lead: Use Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining at level 7; keep Handiwork 3 as a fallback only when the main lane is quiet. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Bellanoir Liberofocused | Medicine ProductionLevel 7 | Medicine Production 7Handiwork 6Transporting 4 | Lead: Use Medicine Production as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Medicine Production at level 7; keep Handiwork 6 and Transporting 4 as a fallback only when the main lane is quiet. Check: If Medicine Production still stalls, check the recipe inputs are present and the medicine output has somewhere to go before replacing the Pal or raising its level. Next: Watch one medicine queue cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Blazamutfocused | MiningLevel 7 | Mining 7Kindling 6 | Lead: Use Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining at level 7; keep Kindling 6 as a fallback only when the main lane is quiet. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Blazamut Ryufocused | MiningLevel 7 | Mining 7Kindling 6 | Lead: Use Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining at level 7; keep Kindling 6 as a fallback only when the main lane is quiet. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Celesdirfocused | LumberingLevel 7 | Lumbering 7Gathering 4 | Lead: Use Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering at level 7; keep Gathering 4 as a fallback only when the main lane is quiet. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Dupinflexible | KindlingLevel 7 | Kindling 7Handiwork 5Medicine Production 4Transporting 2 | Lead: Use Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling at level 7; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Flaraclefocused | KindlingLevel 7 | Kindling 7Handiwork 6Transporting 2 | Lead: Use Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling at level 7; keep Handiwork 6 and Transporting 2 as a fallback only when the main lane is quiet. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Frostallionspecialist | CoolingLevel 7 | Cooling 7 | Lead: Assign Cooling when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for cold-chain stations and temperature-sensitive output; it has no lower-priority job to pull it away. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Frostallion Noctspecialist | GatheringLevel 7 | Gathering 7 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Hartalisfocused | Gathering / LumberingLevel 7 | Gathering 7Lumbering 7 | Lead: Use Gathering and Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Lumbering at level 7; keep as a fallback only when the main lane is quiet. Check: If Gathering and Lumbering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Jormuntidespecialist | WateringLevel 7 | Watering 7 | Lead: Assign Watering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for water-dependent production and the next crop or facility handoff; it has no lower-priority job to pull it away. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Jormuntide Ignisspecialist | KindlingLevel 7 | Kindling 7 | Lead: Assign Kindling when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for furnace and cooking queues that need a steady heat lane; it has no lower-priority job to pull it away. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Knocklemfocused | Mining / TransportingLevel 7 | Mining 7Transporting 7Gathering 4 | Lead: Use Mining and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining and Transporting at level 7; keep Gathering 4 as a fallback only when the main lane is quiet. Check: If Mining and Transporting still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Knocklem Ignisfocused | Mining / TransportingLevel 7 | Mining 7Transporting 7Kindling 5 | Lead: Use Mining and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining and Transporting at level 7; keep Kindling 5 as a fallback only when the main lane is quiet. Check: If Mining and Transporting still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Lyleenflexible | PlantingLevel 7 | Planting 7Gathering 6Handiwork 5Medicine Production 5 | Lead: Use Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Planting at level 7; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Planting still stalls, check the plot has seed input, reachable space, and a connected watering route before replacing the Pal or raising its level. Next: Watch one planting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Lyleen Noctfocused | Medicine ProductionLevel 7 | Medicine Production 7Gathering 6Handiwork 5 | Lead: Use Medicine Production as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Medicine Production at level 7; keep Gathering 6 and Handiwork 5 as a fallback only when the main lane is quiet. Check: If Medicine Production still stalls, check the recipe inputs are present and the medicine output has somewhere to go before replacing the Pal or raising its level. Next: Watch one medicine queue cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Neptiliusspecialist | WateringLevel 7 | Watering 7 | Lead: Assign Watering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for water-dependent production and the next crop or facility handoff; it has no lower-priority job to pull it away. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Ophydiafocused | PlantingLevel 7 | Planting 7Watering 5 | Lead: Use Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Planting at level 7; keep Watering 5 as a fallback only when the main lane is quiet. Check: If Planting still stalls, check the plot has seed input, reachable space, and a connected watering route before replacing the Pal or raising its level. Next: Watch one planting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Selynefocused | HandiworkLevel 7 | Handiwork 7Medicine Production 6Transporting 3 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 7; keep Medicine Production 6 and Transporting 3 as a fallback only when the main lane is quiet. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Starryon Primospecialist | GatheringLevel 7 | Gathering 7 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Anubisfocused | Handiwork / MiningLevel 6 | Handiwork 6Mining 6Transporting 4 | Lead: Use Handiwork and Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Mining at level 6; keep Transporting 4 as a fallback only when the main lane is quiet. Check: If Handiwork and Mining still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Carniboraflexible | PlantingLevel 6 | Planting 6Gathering 4Handiwork 4Transporting 2 | Lead: Use Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Planting at level 6; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Planting still stalls, check the plot has seed input, reachable space, and a connected watering route before replacing the Pal or raising its level. Next: Watch one planting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Cryolinx Terraflexible | LumberingLevel 6 | Lumbering 6Mining 5Transporting 4Handiwork 2 | Lead: Use Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering at level 6; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Dualithflexible | Mining / TransportingLevel 6 | Mining 6Transporting 6Lumbering 5Gathering 3Planting 3 | Lead: Use Mining and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining and Transporting at level 6; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Mining and Transporting still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Dualith Noctflexible | Mining / TransportingLevel 6 | Mining 6Transporting 6Lumbering 5Gathering 3Planting 3 | Lead: Use Mining and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining and Transporting at level 6; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Mining and Transporting still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Dynamofffocused | Generating ElectricityLevel 6 | Generating Electricity 6Gathering 3Transporting 3 | Lead: Use Generating Electricity as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity at level 6; keep Gathering 3 and Transporting 3 as a fallback only when the main lane is quiet. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Eidrolonspecialist | TransportingLevel 6 | Transporting 6 | Lead: Assign Transporting when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for moving finished goods between the station and its destination; it has no lower-priority job to pull it away. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Eidrolon Ignisfocused | Kindling / TransportingLevel 6 | Kindling 6Transporting 6 | Lead: Use Kindling and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling and Transporting at level 6; keep as a fallback only when the main lane is quiet. Check: If Kindling and Transporting still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Falerisfocused | KindlingLevel 6 | Kindling 6Transporting 3 | Lead: Use Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling at level 6; keep Transporting 3 as a fallback only when the main lane is quiet. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Faleris Aquafocused | WateringLevel 6 | Watering 6Transporting 5 | Lead: Use Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Watering at level 6; keep Transporting 5 as a fallback only when the main lane is quiet. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Lapurefocused | HandiworkLevel 6 | Handiwork 6Gathering 5 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 6; keep Gathering 5 as a fallback only when the main lane is quiet. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Menasting Terrafocused | MiningLevel 6 | Mining 6Lumbering 3 | Lead: Use Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining at level 6; keep Lumbering 3 as a fallback only when the main lane is quiet. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Mycoraflexible | Medicine Production / PlantingLevel 6 | Medicine Production 6Planting 6Gathering 4Handiwork 4 | Lead: Use Medicine Production and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Medicine Production and Planting at level 6; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Medicine Production and Planting still stalls, check the recipe inputs are present and the medicine output has somewhere to go before replacing the Pal or raising its level. Next: Watch one medicine queue cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Necromusfocused | Lumbering / MiningLevel 6 | Lumbering 6Mining 6 | Lead: Use Lumbering and Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering and Mining at level 6; keep as a fallback only when the main lane is quiet. Check: If Lumbering and Mining still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Paladiusfocused | Lumbering / MiningLevel 6 | Lumbering 6Mining 6 | Lead: Use Lumbering and Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering and Mining at level 6; keep as a fallback only when the main lane is quiet. Check: If Lumbering and Mining still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Pierdon Crystfocused | CoolingLevel 6 | Cooling 6Mining 5 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 6; keep Mining 5 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Sekhmetfocused | HandiworkLevel 6 | Handiwork 6Mining 3Transporting 2 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 6; keep Mining 3 and Transporting 2 as a fallback only when the main lane is quiet. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Silvegisspecialist | LumberingLevel 6 | Lumbering 6 | Lead: Assign Lumbering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for wood production and the haul from node to storage; it has no lower-priority job to pull it away. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Solmora Luxfocused | Generating ElectricityLevel 6 | Generating Electricity 6Watering 4 | Lead: Use Generating Electricity as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity at level 6; keep Watering 4 as a fallback only when the main lane is quiet. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Splatterinaflexible | HandiworkLevel 6 | Handiwork 6Medicine Production 5Lumbering 3Transporting 2 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 6; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Suzaku Aquaspecialist | WateringLevel 6 | Watering 6 | Lead: Assign Watering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for water-dependent production and the next crop or facility handoff; it has no lower-priority job to pull it away. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Tetroise Primospecialist | MiningLevel 6 | Mining 6 | Lead: Assign Mining when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for ore or stone production at the measured resource lane; it has no lower-priority job to pull it away. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Univolt Crystfocused | CoolingLevel 6 | Cooling 6Lumbering 3 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 6; keep Lumbering 3 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Venusaflexible | Gathering / HandiworkLevel 6 | Gathering 6Handiwork 6Medicine Production 5Transporting 2 | Lead: Use Gathering and Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork at level 6; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Whalaskafocused | CoolingLevel 6 | Cooling 6Watering 5 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 6; keep Watering 5 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Whalaska Ignisfocused | CoolingLevel 6 | Cooling 6Kindling 5 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 6; keep Kindling 5 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Wistellafocused | Handiwork / Medicine ProductionLevel 6 | Handiwork 6Medicine Production 6Transporting 1 | Lead: Use Handiwork and Medicine Production as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Medicine Production at level 6; keep Transporting 1 as a fallback only when the main lane is quiet. Check: If Handiwork and Medicine Production still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Wumpoflexible | TransportingLevel 6 | Transporting 6Cooling 5Lumbering 5Handiwork 3 | Lead: Use Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting at level 6; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Wumpo Botanflexible | TransportingLevel 6 | Transporting 6Lumbering 5Handiwork 3Planting 3 | Lead: Use Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting at level 6; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Azurmanespecialist | Generating ElectricityLevel 5 | Generating Electricity 5 | Lead: Assign Generating Electricity when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for generator uptime and the base power lane; it has no lower-priority job to pull it away. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Beakonfocused | TransportingLevel 5 | Transporting 5Generating Electricity 4Gathering 2 | Lead: Use Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting at level 5; keep Generating Electricity 4 and Gathering 2 as a fallback only when the main lane is quiet. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Beakon Crystfocused | Cooling / TransportingLevel 5 | Cooling 5Transporting 5Gathering 2 | Lead: Use Cooling and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Transporting at level 5; keep Gathering 2 as a fallback only when the main lane is quiet. Check: If Cooling and Transporting still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Bellanoirfocused | Handiwork / Medicine ProductionLevel 5 | Handiwork 5Medicine Production 5Transporting 4 | Lead: Use Handiwork and Medicine Production as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Medicine Production at level 5; keep Transporting 4 as a fallback only when the main lane is quiet. Check: If Handiwork and Medicine Production still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Blazehowlfocused | KindlingLevel 5 | Kindling 5Lumbering 3 | Lead: Use Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling at level 5; keep Lumbering 3 as a fallback only when the main lane is quiet. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Bralohafocused | Gathering / PlantingLevel 5 | Gathering 5Planting 5Mining 3 | Lead: Use Gathering and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Planting at level 5; keep Mining 3 as a fallback only when the main lane is quiet. Check: If Gathering and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Broncherryspecialist | PlantingLevel 5 | Planting 5 | Lead: Assign Planting when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for crop setup from seed placement through the next growth handoff; it has no lower-priority job to pull it away. Check: If Planting still stalls, check the plot has seed input, reachable space, and a connected watering route before replacing the Pal or raising its level. Next: Watch one planting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Broncherry Aquaspecialist | WateringLevel 5 | Watering 5 | Lead: Assign Watering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for water-dependent production and the next crop or facility handoff; it has no lower-priority job to pull it away. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Bushi Noctflexible | LumberingLevel 5 | Lumbering 5Handiwork 2Kindling 2Transporting 2Gathering 1 | Lead: Use Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering at level 5; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Elgrove Crystflexible | CoolingLevel 5 | Cooling 5Lumbering 3Mining 3Transporting 3 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 5; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Fenglope Luxfocused | Generating ElectricityLevel 5 | Generating Electricity 5Lumbering 4 | Lead: Use Generating Electricity as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity at level 5; keep Lumbering 4 as a fallback only when the main lane is quiet. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Ghanglerfocused | WateringLevel 5 | Watering 5Transporting 2 | Lead: Use Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Watering at level 5; keep Transporting 2 as a fallback only when the main lane is quiet. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Ghangler Ignisfocused | Kindling / WateringLevel 5 | Kindling 5Watering 5Transporting 2 | Lead: Use Kindling and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling and Watering at level 5; keep Transporting 2 as a fallback only when the main lane is quiet. Check: If Kindling and Watering still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Gildanespecialist | GatheringLevel 5 | Gathering 5 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Gildrafocused | HandiworkLevel 5 | Handiwork 5Medicine Production 4Transporting 2 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 5; keep Medicine Production 4 and Transporting 2 as a fallback only when the main lane is quiet. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Grizzboltflexible | Generating Electricity / TransportingLevel 5 | Generating Electricity 5Transporting 5Handiwork 4Lumbering 3 | Lead: Use Generating Electricity and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity and Transporting at level 5; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Generating Electricity and Transporting still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Icelynflexible | Cooling / HandiworkLevel 5 | Cooling 5Handiwork 5Medicine Production 4Transporting 2 | Lead: Use Cooling and Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Handiwork at level 5; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Cooling and Handiwork still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Majexflexible | HandiworkLevel 5 | Handiwork 5Kindling 4Medicine Production 3Transporting 2 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 5; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Mammorest Crystfocused | Cooling / LumberingLevel 5 | Cooling 5Lumbering 5Mining 4 | Lead: Use Cooling and Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Lumbering at level 5; keep Mining 4 as a fallback only when the main lane is quiet. Check: If Cooling and Lumbering still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Menastingfocused | MiningLevel 5 | Mining 5Lumbering 3 | Lead: Use Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining at level 5; keep Lumbering 3 as a fallback only when the main lane is quiet. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Moldronfocused | Kindling / MiningLevel 5 | Kindling 5Mining 5 | Lead: Use Kindling and Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling and Mining at level 5; keep as a fallback only when the main lane is quiet. Check: If Kindling and Mining still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Moldron Crystfocused | Cooling / MiningLevel 5 | Cooling 5Mining 5 | Lead: Use Cooling and Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Mining at level 5; keep as a fallback only when the main lane is quiet. Check: If Cooling and Mining still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Omasculspecialist | GatheringLevel 5 | Gathering 5 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Palumbafocused | MiningLevel 5 | Mining 5Gathering 4Planting 4 | Lead: Use Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining at level 5; keep Gathering 4 and Planting 4 as a fallback only when the main lane is quiet. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Pierdonspecialist | MiningLevel 5 | Mining 5 | Lead: Assign Mining when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for ore or stone production at the measured resource lane; it has no lower-priority job to pull it away. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Quivern Botanflexible | PlantingLevel 5 | Planting 5Gathering 4Transporting 4Mining 3Handiwork 2 | Lead: Use Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Planting at level 5; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Planting still stalls, check the plot has seed input, reachable space, and a connected watering route before replacing the Pal or raising its level. Next: Watch one planting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Ragnahawkfocused | TransportingLevel 5 | Transporting 5Kindling 4 | Lead: Use Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting at level 5; keep Kindling 4 as a fallback only when the main lane is quiet. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Reptyrofocused | Kindling / MiningLevel 5 | Kindling 5Mining 5 | Lead: Use Kindling and Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling and Mining at level 5; keep as a fallback only when the main lane is quiet. Check: If Kindling and Mining still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Reptyro Crystfocused | Cooling / MiningLevel 5 | Cooling 5Mining 5 | Lead: Use Cooling and Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Mining at level 5; keep as a fallback only when the main lane is quiet. Check: If Cooling and Mining still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Roujayfocused | Gathering / TransportingLevel 5 | Gathering 5Transporting 5 | Lead: Use Gathering and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Transporting at level 5; keep as a fallback only when the main lane is quiet. Check: If Gathering and Transporting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Suzakuspecialist | KindlingLevel 5 | Kindling 5 | Lead: Assign Kindling when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for furnace and cooking queues that need a steady heat lane; it has no lower-priority job to pull it away. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Tropicawfocused | Gathering / PlantingLevel 5 | Gathering 5Planting 5 | Lead: Use Gathering and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Planting at level 5; keep as a fallback only when the main lane is quiet. Check: If Gathering and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Verdashflexible | Gathering / HandiworkLevel 5 | Gathering 5Handiwork 5Planting 4Lumbering 3Transporting 3 | Lead: Use Gathering and Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork at level 5; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Warsectflexible | TransportingLevel 5 | Transporting 5Lumbering 4Handiwork 3Planting 3 | Lead: Use Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting at level 5; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Warsect Terrafocused | Mining / TransportingLevel 5 | Mining 5Transporting 5Handiwork 2 | Lead: Use Mining and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining and Transporting at level 5; keep Handiwork 2 as a fallback only when the main lane is quiet. Check: If Mining and Transporting still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Azurobespecialist | WateringLevel 4 | Watering 4 | Lead: Assign Watering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for water-dependent production and the next crop or facility handoff; it has no lower-priority job to pull it away. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Azurobe Crystspecialist | CoolingLevel 4 | Cooling 4 | Lead: Assign Cooling when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for cold-chain stations and temperature-sensitive output; it has no lower-priority job to pull it away. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Bakemifocused | Medicine ProductionLevel 4 | Medicine Production 4Handiwork 3Transporting 2 | Lead: Use Medicine Production as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Medicine Production at level 4; keep Handiwork 3 and Transporting 2 as a fallback only when the main lane is quiet. Check: If Medicine Production still stalls, check the recipe inputs are present and the medicine output has somewhere to go before replacing the Pal or raising its level. Next: Watch one medicine queue cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Bulldosufocused | MiningLevel 4 | Mining 4Transporting 3 | Lead: Use Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining at level 4; keep Transporting 3 as a fallback only when the main lane is quiet. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Chillet Ignisfocused | KindlingLevel 4 | Kindling 4Gathering 3 | Lead: Use Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling at level 4; keep Gathering 3 as a fallback only when the main lane is quiet. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Cryolinxflexible | Cooling / Lumbering / TransportingLevel 4 | Cooling 4Lumbering 4Transporting 4Handiwork 3 | Lead: Use Cooling and Lumbering and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Lumbering and Transporting at level 4; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Cooling and Lumbering and Transporting still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Digtoisespecialist | MiningLevel 4 | Mining 4 | Lead: Assign Mining when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for ore or stone production at the measured resource lane; it has no lower-priority job to pull it away. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Dogenflexible | HandiworkLevel 4 | Handiwork 4Gathering 3Lumbering 3Transporting 3Medicine Production 2 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 4; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Dumud Gildflexible | FarmingLevel 4 | Farming 4Mining 2Watering 2Transporting 1 | Lead: Use Farming as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming at level 4; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Farming still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Elizabeeflexible | Gathering / Handiwork / Medicine Production / PlantingLevel 4 | Gathering 4Handiwork 4Medicine Production 4Planting 4Lumbering 3 | Lead: Use Gathering and Handiwork and Medicine Production and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Medicine Production and Planting at level 4; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork and Medicine Production and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Elphidran Aquafocused | WateringLevel 4 | Watering 4Lumbering 3 | Lead: Use Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Watering at level 4; keep Lumbering 3 as a fallback only when the main lane is quiet. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Eye of Cthulhuspecialist | TransportingLevel 4 | Transporting 4 | Lead: Assign Transporting when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for moving finished goods between the station and its destination; it has no lower-priority job to pull it away. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Foxciclefocused | CoolingLevel 4 | Cooling 4Farming 3 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 4; keep Farming 3 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Frostplumefocused | CoolingLevel 4 | Cooling 4Gathering 2 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 4; keep Gathering 2 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Helzephyrspecialist | TransportingLevel 4 | Transporting 4 | Lead: Assign Transporting when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for moving finished goods between the station and its destination; it has no lower-priority job to pull it away. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Incineram Noctfocused | MiningLevel 4 | Mining 4Handiwork 3Transporting 3 | Lead: Use Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining at level 4; keep Handiwork 3 and Transporting 3 as a fallback only when the main lane is quiet. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Kingpaca Crystfocused | CoolingLevel 4 | Cooling 4Gathering 2 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 4; keep Gathering 2 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Kitsun Noctspecialist | KindlingLevel 4 | Kindling 4 | Lead: Assign Kindling when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for furnace and cooking queues that need a steady heat lane; it has no lower-priority job to pull it away. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Lapironflexible | GatheringLevel 4 | Gathering 4Handiwork 3Mining 2Transporting 1 | Lead: Use Gathering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering at level 4; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Loomenfocused | Handiwork / Kindling / Medicine ProductionLevel 4 | Handiwork 4Kindling 4Medicine Production 4 | Lead: Use Handiwork and Kindling and Medicine Production as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Kindling and Medicine Production at level 4; keep as a fallback only when the main lane is quiet. Check: If Handiwork and Kindling and Medicine Production still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Loupmoon Crystfocused | Cooling / HandiworkLevel 4 | Cooling 4Handiwork 4 | Lead: Use Cooling and Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Handiwork at level 4; keep as a fallback only when the main lane is quiet. Check: If Cooling and Handiwork still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Lunarisfocused | HandiworkLevel 4 | Handiwork 4Gathering 2Transporting 2 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 4; keep Gathering 2 and Transporting 2 as a fallback only when the main lane is quiet. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Mammorestfocused | Lumbering / Mining / PlantingLevel 4 | Lumbering 4Mining 4Planting 4 | Lead: Use Lumbering and Mining and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering and Mining and Planting at level 4; keep as a fallback only when the main lane is quiet. Check: If Lumbering and Mining and Planting still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Maraithfocused | Gathering / MiningLevel 4 | Gathering 4Mining 4 | Lead: Use Gathering and Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Mining at level 4; keep as a fallback only when the main lane is quiet. Check: If Gathering and Mining still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Mossandaflexible | Lumbering / TransportingLevel 4 | Lumbering 4Transporting 4Planting 3Handiwork 2 | Lead: Use Lumbering and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering and Transporting at level 4; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Lumbering and Transporting still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Mossanda Luxflexible | Generating Electricity / Lumbering / TransportingLevel 4 | Generating Electricity 4Lumbering 4Transporting 4Handiwork 3 | Lead: Use Generating Electricity and Lumbering and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity and Lumbering and Transporting at level 4; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Generating Electricity and Lumbering and Transporting still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Nitemaryfocused | HandiworkLevel 4 | Handiwork 4Transporting 2 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 4; keep Transporting 2 as a fallback only when the main lane is quiet. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Nitemary Botanfocused | HandiworkLevel 4 | Handiwork 4Planting 3Transporting 2 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 4; keep Planting 3 and Transporting 2 as a fallback only when the main lane is quiet. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Nyafiaflexible | Gathering / HandiworkLevel 4 | Gathering 4Handiwork 4Transporting 3Lumbering 2 | Lead: Use Gathering and Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork at level 4; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Petalliaflexible | Medicine Production / PlantingLevel 4 | Medicine Production 4Planting 4Gathering 3Handiwork 3Transporting 2 | Lead: Use Medicine Production and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Medicine Production and Planting at level 4; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Medicine Production and Planting still stalls, check the recipe inputs are present and the medicine output has somewhere to go before replacing the Pal or raising its level. Next: Watch one medicine queue cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Petallia Ignisflexible | Kindling / Medicine ProductionLevel 4 | Kindling 4Medicine Production 4Gathering 3Handiwork 3Transporting 2 | Lead: Use Kindling and Medicine Production as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling and Medicine Production at level 4; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Kindling and Medicine Production still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Polapupfocused | CoolingLevel 4 | Cooling 4Watering 3 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 4; keep Watering 3 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Polapup Terrafocused | Cooling / MiningLevel 4 | Cooling 4Mining 4 | Lead: Use Cooling and Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Mining at level 4; keep as a fallback only when the main lane is quiet. Check: If Cooling and Mining still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Prixterfocused | LumberingLevel 4 | Lumbering 4Gathering 2Medicine Production 2 | Lead: Use Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering at level 4; keep Gathering 2 and Medicine Production 2 as a fallback only when the main lane is quiet. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Prixter Luxfocused | LumberingLevel 4 | Lumbering 4Generating Electricity 3Medicine Production 2 | Lead: Use Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering at level 4; keep Generating Electricity 3 and Medicine Production 2 as a fallback only when the main lane is quiet. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Pyrinfocused | KindlingLevel 4 | Kindling 4Lumbering 2 | Lead: Use Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling at level 4; keep Lumbering 2 as a fallback only when the main lane is quiet. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Pyrin Noctfocused | KindlingLevel 4 | Kindling 4Lumbering 3 | Lead: Use Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling at level 4; keep Lumbering 3 as a fallback only when the main lane is quiet. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Rayhoundspecialist | Generating ElectricityLevel 4 | Generating Electricity 4 | Lead: Assign Generating Electricity when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for generator uptime and the base power lane; it has no lower-priority job to pull it away. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Relaxaurus Luxfocused | Generating ElectricityLevel 4 | Generating Electricity 4Transporting 3 | Lead: Use Generating Electricity as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity at level 4; keep Transporting 3 as a fallback only when the main lane is quiet. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Sibelyx Primofocused | FarmingLevel 4 | Farming 4Medicine Production 3 | Lead: Use Farming as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming at level 4; keep Medicine Production 3 as a fallback only when the main lane is quiet. Check: If Farming still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Skutlassfocused | Lumbering / WateringLevel 4 | Lumbering 4Watering 4Gathering 1 | Lead: Use Lumbering and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering and Watering at level 4; keep Gathering 1 as a fallback only when the main lane is quiet. Check: If Lumbering and Watering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Snockspecialist | Generating ElectricityLevel 4 | Generating Electricity 4 | Lead: Assign Generating Electricity when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for generator uptime and the base power lane; it has no lower-priority job to pull it away. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Snock Terraspecialist | Generating ElectricityLevel 4 | Generating Electricity 4 | Lead: Assign Generating Electricity when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for generator uptime and the base power lane; it has no lower-priority job to pull it away. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Solmoraspecialist | WateringLevel 4 | Watering 4 | Lead: Assign Watering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for water-dependent production and the next crop or facility handoff; it has no lower-priority job to pull it away. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Tetroisespecialist | MiningLevel 4 | Mining 4 | Lead: Assign Mining when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for ore or stone production at the measured resource lane; it has no lower-priority job to pull it away. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Wixen Noctfocused | Handiwork / KindlingLevel 4 | Handiwork 4Kindling 4Transporting 2 | Lead: Use Handiwork and Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Kindling at level 4; keep Transporting 2 as a fallback only when the main lane is quiet. Check: If Handiwork and Kindling still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Xenogardspecialist | MiningLevel 4 | Mining 4 | Lead: Assign Mining when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for ore or stone production at the measured resource lane; it has no lower-priority job to pull it away. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Arsoxfocused | KindlingLevel 3 | Kindling 3Lumbering 2 | Lead: Use Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling at level 3; keep Lumbering 2 as a fallback only when the main lane is quiet. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Beegardeflexible | Farming / GatheringLevel 3 | Farming 3Gathering 3Handiwork 2Lumbering 2Medicine Production 2Planting 2Transporting 2 | Lead: Use Farming and Gathering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming and Gathering at level 3; this Pal covers 7 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Farming and Gathering still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Bushiflexible | LumberingLevel 3 | Lumbering 3Handiwork 2Kindling 2Transporting 2Gathering 1 | Lead: Use Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering at level 3; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Dazzifocused | Generating ElectricityLevel 3 | Generating Electricity 3Handiwork 2Transporting 2 | Lead: Use Generating Electricity as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity at level 3; keep Handiwork 2 and Transporting 2 as a fallback only when the main lane is quiet. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Dinossomfocused | Lumbering / PlantingLevel 3 | Lumbering 3Planting 3 | Lead: Use Lumbering and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering and Planting at level 3; keep as a fallback only when the main lane is quiet. Check: If Lumbering and Planting still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Elgroveflexible | Lumbering / Planting / TransportingLevel 3 | Lumbering 3Planting 3Transporting 3Gathering 2Mining 2 | Lead: Use Lumbering and Planting and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering and Planting and Transporting at level 3; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Lumbering and Planting and Transporting still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Elphidranspecialist | LumberingLevel 3 | Lumbering 3 | Lead: Assign Lumbering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for wood production and the haul from node to storage; it has no lower-priority job to pull it away. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Felbatspecialist | Medicine ProductionLevel 3 | Medicine Production 3 | Lead: Assign Medicine Production when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for medicine queues with ingredients and output space ready; it has no lower-priority job to pull it away. Check: If Medicine Production still stalls, check the recipe inputs are present and the medicine output has somewhere to go before replacing the Pal or raising its level. Next: Watch one medicine queue cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Fenglopespecialist | LumberingLevel 3 | Lumbering 3 | Lead: Assign Lumbering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for wood production and the haul from node to storage; it has no lower-priority job to pull it away. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Goriratfocused | Lumbering / TransportingLevel 3 | Lumbering 3Transporting 3Handiwork 2 | Lead: Use Lumbering and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering and Transporting at level 3; keep Handiwork 2 as a fallback only when the main lane is quiet. Check: If Lumbering and Transporting still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Gorirat Terrafocused | Mining / TransportingLevel 3 | Mining 3Transporting 3Handiwork 2 | Lead: Use Mining and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining and Transporting at level 3; keep Handiwork 2 as a fallback only when the main lane is quiet. Check: If Mining and Transporting still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Grintalespecialist | GatheringLevel 3 | Gathering 3 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Hangyu Crystflexible | Handiwork / TransportingLevel 3 | Handiwork 3Transporting 3Cooling 2Gathering 2 | Lead: Use Handiwork and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Transporting at level 3; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Handiwork and Transporting still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Incineramflexible | Kindling / MiningLevel 3 | Kindling 3Mining 3Handiwork 2Transporting 2 | Lead: Use Kindling and Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling and Mining at level 3; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Kindling and Mining still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Katressfocused | Handiwork / Medicine ProductionLevel 3 | Handiwork 3Medicine Production 3Transporting 2 | Lead: Use Handiwork and Medicine Production as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Medicine Production at level 3; keep Transporting 2 as a fallback only when the main lane is quiet. Check: If Handiwork and Medicine Production still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Katress Ignisflexible | Handiwork / Kindling / Medicine ProductionLevel 3 | Handiwork 3Kindling 3Medicine Production 3Transporting 2 | Lead: Use Handiwork and Kindling and Medicine Production as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Kindling and Medicine Production at level 3; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Handiwork and Kindling and Medicine Production still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Kitsunspecialist | KindlingLevel 3 | Kindling 3 | Lead: Assign Kindling when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for furnace and cooking queues that need a steady heat lane; it has no lower-priority job to pull it away. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Leafanflexible | Gathering / Handiwork / PlantingLevel 3 | Gathering 3Handiwork 3Planting 3Transporting 2 | Lead: Use Gathering and Handiwork and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Planting at level 3; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Lovanderflexible | Handiwork / Medicine ProductionLevel 3 | Handiwork 3Medicine Production 3Mining 2Transporting 2 | Lead: Use Handiwork and Medicine Production as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Medicine Production at level 3; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Handiwork and Medicine Production still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Lulluflexible | Handiwork / Medicine Production / PlantingLevel 3 | Handiwork 3Medicine Production 3Planting 3Gathering 2 | Lead: Use Handiwork and Medicine Production and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Medicine Production and Planting at level 3; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Handiwork and Medicine Production and Planting still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Munchillfocused | CoolingLevel 3 | Cooling 3Watering 2Transporting 1 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 3; keep Watering 2 and Transporting 1 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Needollfocused | Gathering / PlantingLevel 3 | Gathering 3Planting 3Transporting 1 | Lead: Use Gathering and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Planting at level 3; keep Transporting 1 as a fallback only when the main lane is quiet. Check: If Gathering and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Needoll Noctfocused | Gathering / PlantingLevel 3 | Gathering 3Planting 3Transporting 1 | Lead: Use Gathering and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Planting at level 3; keep Transporting 1 as a fallback only when the main lane is quiet. Check: If Gathering and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Penkingflexible | Mining / TransportingLevel 3 | Mining 3Transporting 3Cooling 2Handiwork 2Watering 2 | Lead: Use Mining and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining and Transporting at level 3; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Mining and Transporting still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Penking Luxflexible | Generating Electricity / Mining / TransportingLevel 3 | Generating Electricity 3Mining 3Transporting 3Handiwork 2Watering 2 | Lead: Use Generating Electricity and Mining and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity and Mining and Transporting at level 3; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Generating Electricity and Mining and Transporting still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Pruneliaflexible | Medicine Production / PlantingLevel 3 | Medicine Production 3Planting 3Gathering 2Handiwork 1Transporting 1 | Lead: Use Medicine Production and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Medicine Production and Planting at level 3; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Medicine Production and Planting still stalls, check the recipe inputs are present and the medicine output has somewhere to go before replacing the Pal or raising its level. Next: Watch one medicine queue cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Rayhound Crystspecialist | CoolingLevel 3 | Cooling 3 | Lead: Assign Cooling when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for cold-chain stations and temperature-sensitive output; it has no lower-priority job to pull it away. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Reindrixfocused | Cooling / LumberingLevel 3 | Cooling 3Lumbering 3 | Lead: Use Cooling and Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Lumbering at level 3; keep as a fallback only when the main lane is quiet. Check: If Cooling and Lumbering still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Relaxaurusfocused | Transporting / WateringLevel 3 | Transporting 3Watering 3 | Lead: Use Transporting and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting and Watering at level 3; keep as a fallback only when the main lane is quiet. Check: If Transporting and Watering still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Robinquillflexible | Gathering / HandiworkLevel 3 | Gathering 3Handiwork 3Lumbering 2Planting 2Transporting 2Medicine Production 1 | Lead: Use Gathering and Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork at level 3; this Pal covers 6 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Robinquill Terraflexible | Gathering / HandiworkLevel 3 | Gathering 3Handiwork 3Lumbering 2Medicine Production 2Transporting 2 | Lead: Use Gathering and Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork at level 3; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Shroomerflexible | Farming / Gathering / PlantingLevel 3 | Farming 3Gathering 3Planting 3Handiwork 2Lumbering 2 | Lead: Use Farming and Gathering and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming and Gathering and Planting at level 3; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Farming and Gathering and Planting still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Shroomer Noctflexible | Gathering / Handiwork / PlantingLevel 3 | Gathering 3Handiwork 3Planting 3Lumbering 2 | Lead: Use Gathering and Handiwork and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Planting at level 3; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Sibelyxfocused | Cooling / Farming / Medicine ProductionLevel 3 | Cooling 3Farming 3Medicine Production 3 | Lead: Use Cooling and Farming and Medicine Production as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Farming and Medicine Production at level 3; keep as a fallback only when the main lane is quiet. Check: If Cooling and Farming and Medicine Production still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Skutlass Ignisflexible | Kindling / LumberingLevel 3 | Kindling 3Lumbering 3Gathering 2Watering 2 | Lead: Use Kindling and Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling and Lumbering at level 3; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Kindling and Lumbering still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Slowattspecialist | Generating ElectricityLevel 3 | Generating Electricity 3 | Lead: Assign Generating Electricity when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for generator uptime and the base power lane; it has no lower-priority job to pull it away. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Snuglooflexible | Cooling / MiningLevel 3 | Cooling 3Mining 3Handiwork 2Transporting 2 | Lead: Use Cooling and Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Mining at level 3; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Cooling and Mining still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Sootseerflexible | Handiwork / Kindling / MiningLevel 3 | Handiwork 3Kindling 3Mining 3Farming 2Gathering 2 | Lead: Use Handiwork and Kindling and Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Kindling and Mining at level 3; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Handiwork and Kindling and Mining still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Surfentfocused | WateringLevel 3 | Watering 3Farming 2 | Lead: Use Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Watering at level 3; keep Farming 2 as a fallback only when the main lane is quiet. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Surfent Terraspecialist | GatheringLevel 3 | Gathering 3 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Sweepafocused | CoolingLevel 3 | Cooling 3Gathering 2 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 3; keep Gathering 2 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Tarantrissflexible | Gathering / HandiworkLevel 3 | Gathering 3Handiwork 3Medicine Production 2Transporting 2 | Lead: Use Gathering and Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork at level 3; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Tombatfocused | MiningLevel 3 | Mining 3Gathering 2Transporting 2 | Lead: Use Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining at level 3; keep Gathering 2 and Transporting 2 as a fallback only when the main lane is quiet. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Turtacle Terrafocused | MiningLevel 3 | Mining 3Watering 2Transporting 1 | Lead: Use Mining as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining at level 3; keep Watering 2 and Transporting 1 as a fallback only when the main lane is quiet. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Univoltfocused | Generating ElectricityLevel 3 | Generating Electricity 3Lumbering 1 | Lead: Use Generating Electricity as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity at level 3; keep Lumbering 1 as a fallback only when the main lane is quiet. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Vaeletflexible | Gathering / Handiwork / Medicine Production / PlantingLevel 3 | Gathering 3Handiwork 3Medicine Production 3Planting 3Farming 2Transporting 2 | Lead: Use Gathering and Handiwork and Medicine Production and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Medicine Production and Planting at level 3; this Pal covers 6 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork and Medicine Production and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Vanwyrmfocused | TransportingLevel 3 | Transporting 3Kindling 2 | Lead: Use Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting at level 3; keep Kindling 2 as a fallback only when the main lane is quiet. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Vanwyrm Crystfocused | TransportingLevel 3 | Transporting 3Cooling 2 | Lead: Use Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting at level 3; keep Cooling 2 as a fallback only when the main lane is quiet. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Wixenfocused | Handiwork / KindlingLevel 3 | Handiwork 3Kindling 3Transporting 2 | Lead: Use Handiwork and Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Kindling at level 3; keep Transporting 2 as a fallback only when the main lane is quiet. Check: If Handiwork and Kindling still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Xenovaderfocused | LumberingLevel 3 | Lumbering 3Transporting 2 | Lead: Use Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering at level 3; keep Transporting 2 as a fallback only when the main lane is quiet. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Amionefocused | HandiworkLevel 2 | Handiwork 2Transporting 1Watering 1 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 2; keep Transporting 1 and Watering 1 as a fallback only when the main lane is quiet. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Bristlaflexible | Gathering / Handiwork / Medicine Production / PlantingLevel 2 | Gathering 2Handiwork 2Medicine Production 2Planting 2Transporting 1 | Lead: Use Gathering and Handiwork and Medicine Production and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Medicine Production and Planting at level 2; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork and Medicine Production and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Caprityfocused | PlantingLevel 2 | Planting 2Farming 1 | Lead: Use Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Planting at level 2; keep Farming 1 as a fallback only when the main lane is quiet. Check: If Planting still stalls, check the plot has seed input, reachable space, and a connected watering route before replacing the Pal or raising its level. Next: Watch one planting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Caprity Noctfocused | PlantingLevel 2 | Planting 2Farming 1 | Lead: Use Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Planting at level 2; keep Farming 1 as a fallback only when the main lane is quiet. Check: If Planting still stalls, check the plot has seed input, reachable space, and a connected watering route before replacing the Pal or raising its level. Next: Watch one planting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Cawgnitofocused | LumberingLevel 2 | Lumbering 2Farming 1 | Lead: Use Lumbering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Lumbering at level 2; keep Farming 1 as a fallback only when the main lane is quiet. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Celaray Luxfocused | Generating ElectricityLevel 2 | Generating Electricity 2Transporting 1Watering 1 | Lead: Use Generating Electricity as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity at level 2; keep Transporting 1 and Watering 1 as a fallback only when the main lane is quiet. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Chilletfocused | CoolingLevel 2 | Cooling 2Gathering 1 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 2; keep Gathering 1 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Cinnamothfocused | Gathering / Medicine Production / PlantingLevel 2 | Gathering 2Medicine Production 2Planting 2 | Lead: Use Gathering and Medicine Production and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Medicine Production and Planting at level 2; keep as a fallback only when the main lane is quiet. Check: If Gathering and Medicine Production and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Cremisfocused | FarmingLevel 2 | Farming 2Gathering 1 | Lead: Use Farming as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming at level 2; keep Gathering 1 as a fallback only when the main lane is quiet. Check: If Farming still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Croajiro Noctflexible | HandiworkLevel 2 | Handiwork 2Gathering 1Transporting 1Watering 1 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 2; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Dazemuspecialist | GatheringLevel 2 | Gathering 2 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Dazzi Noctflexible | TransportingLevel 2 | Transporting 2Generating Electricity 1Handiwork 1Medicine Production 1 | Lead: Use Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting at level 2; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Dumudflexible | Mining / WateringLevel 2 | Mining 2Watering 2Farming 1Transporting 1 | Lead: Use Mining and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Mining and Watering at level 2; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Mining and Watering still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Eikthyrdeerspecialist | LumberingLevel 2 | Lumbering 2 | Lead: Assign Lumbering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for wood production and the haul from node to storage; it has no lower-priority job to pull it away. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Eikthyrdeer Terraspecialist | LumberingLevel 2 | Lumbering 2 | Lead: Assign Lumbering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for wood production and the haul from node to storage; it has no lower-priority job to pull it away. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Finsiderfocused | WateringLevel 2 | Watering 2Transporting 1 | Lead: Use Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Watering at level 2; keep Transporting 1 as a fallback only when the main lane is quiet. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Finsider Ignisfocused | Kindling / WateringLevel 2 | Kindling 2Watering 2Transporting 1 | Lead: Use Kindling and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling and Watering at level 2; keep Transporting 1 as a fallback only when the main lane is quiet. Check: If Kindling and Watering still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Flopieflexible | Gathering / Handiwork / PlantingLevel 2 | Gathering 2Handiwork 2Planting 2Medicine Production 1Transporting 1 | Lead: Use Gathering and Handiwork and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Planting at level 2; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Foxparks Crystspecialist | CoolingLevel 2 | Cooling 2 | Lead: Assign Cooling when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for cold-chain stations and temperature-sensitive output; it has no lower-priority job to pull it away. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Fuack Ignisflexible | Kindling / WateringLevel 2 | Kindling 2Watering 2Handiwork 1Transporting 1 | Lead: Use Kindling and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Kindling and Watering at level 2; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Kindling and Watering still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Galeclawspecialist | GatheringLevel 2 | Gathering 2 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Gloopiefocused | Handiwork / Transporting / WateringLevel 2 | Handiwork 2Transporting 2Watering 2 | Lead: Use Handiwork and Transporting and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Transporting and Watering at level 2; keep as a fallback only when the main lane is quiet. Check: If Handiwork and Transporting and Watering still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Gloopie Primofocused | Handiwork / Transporting / WateringLevel 2 | Handiwork 2Transporting 2Watering 2 | Lead: Use Handiwork and Transporting and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Transporting and Watering at level 2; keep as a fallback only when the main lane is quiet. Check: If Handiwork and Transporting and Watering still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Gobfinfocused | Handiwork / WateringLevel 2 | Handiwork 2Watering 2Transporting 1 | Lead: Use Handiwork and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Watering at level 2; keep Transporting 1 as a fallback only when the main lane is quiet. Check: If Handiwork and Watering still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Gobfin Ignisfocused | Handiwork / KindlingLevel 2 | Handiwork 2Kindling 2Transporting 1 | Lead: Use Handiwork and Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Kindling at level 2; keep Transporting 1 as a fallback only when the main lane is quiet. Check: If Handiwork and Kindling still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Hangyufocused | TransportingLevel 2 | Transporting 2Gathering 1Handiwork 1 | Lead: Use Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting at level 2; keep Gathering 1 and Handiwork 1 as a fallback only when the main lane is quiet. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Jelliettefocused | WateringLevel 2 | Watering 2Handiwork 1Transporting 1 | Lead: Use Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Watering at level 2; keep Handiwork 1 and Transporting 1 as a fallback only when the main lane is quiet. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Jellroyflexible | WateringLevel 2 | Watering 2Handiwork 1Medicine Production 1Transporting 1 | Lead: Use Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Watering at level 2; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Killamarifocused | TransportingLevel 2 | Transporting 2Gathering 1Watering 1 | Lead: Use Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting at level 2; keep Gathering 1 and Watering 1 as a fallback only when the main lane is quiet. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Killamari Primofocused | TransportingLevel 2 | Transporting 2Gathering 1Watering 1 | Lead: Use Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting at level 2; keep Gathering 1 and Watering 1 as a fallback only when the main lane is quiet. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Kingpacaspecialist | GatheringLevel 2 | Gathering 2 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Leezpunkfocused | HandiworkLevel 2 | Handiwork 2Gathering 1Transporting 1 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 2; keep Gathering 1 and Transporting 1 as a fallback only when the main lane is quiet. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Leezpunk Ignisflexible | Handiwork / KindlingLevel 2 | Handiwork 2Kindling 2Gathering 1Transporting 1 | Lead: Use Handiwork and Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Kindling at level 2; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Handiwork and Kindling still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Loupmoonspecialist | HandiworkLevel 2 | Handiwork 2 | Lead: Assign Handiwork when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for crafting queues that already have materials waiting; it has no lower-priority job to pull it away. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Melpacaspecialist | FarmingLevel 2 | Farming 2 | Lead: Assign Farming when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for ranch output and a predictable collection loop; it has no lower-priority job to pull it away. Check: If Farming still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Mimogfocused | TransportingLevel 2 | Transporting 2Gathering 1 | Lead: Use Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting at level 2; keep Gathering 1 as a fallback only when the main lane is quiet. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Mozzarinaspecialist | FarmingLevel 2 | Farming 2 | Lead: Assign Farming when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for ranch output and a predictable collection loop; it has no lower-priority job to pull it away. Check: If Farming still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Mufflyfocused | CoolingLevel 2 | Cooling 2Transporting 1 | Lead: Use Cooling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling at level 2; keep Transporting 1 as a fallback only when the main lane is quiet. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Nitewingspecialist | GatheringLevel 2 | Gathering 2 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Pengullet Luxflexible | Generating ElectricityLevel 2 | Generating Electricity 2Handiwork 1Transporting 1Watering 1 | Lead: Use Generating Electricity as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity at level 2; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Puffoltfocused | Generating ElectricityLevel 2 | Generating Electricity 2Transporting 1 | Lead: Use Generating Electricity as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Generating Electricity at level 2; keep Transporting 1 as a fallback only when the main lane is quiet. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Ribbuny Botanflexible | Gathering / Handiwork / PlantingLevel 2 | Gathering 2Handiwork 2Planting 2Transporting 1 | Lead: Use Gathering and Handiwork and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Planting at level 2; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Shadowbeakspecialist | GatheringLevel 2 | Gathering 2 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Smokiespecialist | GatheringLevel 2 | Gathering 2 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Smokie Crystfocused | Cooling / GatheringLevel 2 | Cooling 2Gathering 2 | Lead: Use Cooling and Gathering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Gathering at level 2; keep as a fallback only when the main lane is quiet. Check: If Cooling and Gathering still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Soufflinefocused | Planting / TransportingLevel 2 | Planting 2Transporting 2 | Lead: Use Planting and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Planting and Transporting at level 2; keep as a fallback only when the main lane is quiet. Check: If Planting and Transporting still stalls, check the plot has seed input, reachable space, and a connected watering route before replacing the Pal or raising its level. Next: Watch one planting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Turtaclefocused | WateringLevel 2 | Watering 2Mining 1Transporting 1 | Lead: Use Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Watering at level 2; keep Mining 1 and Transporting 1 as a fallback only when the main lane is quiet. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Valentailspecialist | GatheringLevel 2 | Gathering 2 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Wispawflexible | HandiworkLevel 2 | Handiwork 2Lumbering 1Medicine Production 1Transporting 1 | Lead: Use Handiwork as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork at level 2; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Handiwork still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Xenolordspecialist | GatheringLevel 2 | Gathering 2 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Yakumospecialist | GatheringLevel 2 | Gathering 2 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Blue Slimespecialist | TransportingLevel 1 | Transporting 1 | Lead: Assign Transporting when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for moving finished goods between the station and its destination; it has no lower-priority job to pull it away. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Cattivaflexible | Gathering / Handiwork / Mining / TransportingLevel 1 | Gathering 1Handiwork 1Mining 1Transporting 1 | Lead: Use Gathering and Handiwork and Mining and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Mining and Transporting at level 1; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork and Mining and Transporting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Cave Batspecialist | GatheringLevel 1 | Gathering 1 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Celarayfocused | Transporting / WateringLevel 1 | Transporting 1Watering 1 | Lead: Use Transporting and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Transporting and Watering at level 1; keep as a fallback only when the main lane is quiet. Check: If Transporting and Watering still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Chikipifocused | Farming / GatheringLevel 1 | Farming 1Gathering 1 | Lead: Use Farming and Gathering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming and Gathering at level 1; keep as a fallback only when the main lane is quiet. Check: If Farming and Gathering still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Cloveefocused | Gathering / PlantingLevel 1 | Gathering 1Planting 1 | Lead: Use Gathering and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Planting at level 1; keep as a fallback only when the main lane is quiet. Check: If Gathering and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Croajiroflexible | Gathering / Handiwork / Transporting / WateringLevel 1 | Gathering 1Handiwork 1Transporting 1Watering 1 | Lead: Use Gathering and Handiwork and Transporting and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Transporting and Watering at level 1; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork and Transporting and Watering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Daedreamfocused | Gathering / Handiwork / TransportingLevel 1 | Gathering 1Handiwork 1Transporting 1 | Lead: Use Gathering and Handiwork and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Transporting at level 1; keep as a fallback only when the main lane is quiet. Check: If Gathering and Handiwork and Transporting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Demon Eyespecialist | TransportingLevel 1 | Transporting 1 | Lead: Assign Transporting when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for moving finished goods between the station and its destination; it has no lower-priority job to pull it away. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Depressoflexible | Farming / Handiwork / Mining / TransportingLevel 1 | Farming 1Handiwork 1Mining 1Transporting 1 | Lead: Use Farming and Handiwork and Mining and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming and Handiwork and Mining and Transporting at level 1; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Farming and Handiwork and Mining and Transporting still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Direhowlspecialist | GatheringLevel 1 | Gathering 1 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Enchanted Swordspecialist | LumberingLevel 1 | Lumbering 1 | Lead: Assign Lumbering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for wood production and the haul from node to storage; it has no lower-priority job to pull it away. Check: If Lumbering still stalls, check the lumber node is reachable and the haul route is not blocked before replacing the Pal or raising its level. Next: Watch one wood handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Flambelleflexible | Farming / Handiwork / Kindling / TransportingLevel 1 | Farming 1Handiwork 1Kindling 1Transporting 1 | Lead: Use Farming and Handiwork and Kindling and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming and Handiwork and Kindling and Transporting at level 1; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Farming and Handiwork and Kindling and Transporting still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Foxparksspecialist | KindlingLevel 1 | Kindling 1 | Lead: Assign Kindling when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for furnace and cooking queues that need a steady heat lane; it has no lower-priority job to pull it away. Check: If Kindling still stalls, check the station has fuel or materials and an open output path before replacing the Pal or raising its level. Next: Watch one furnace cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Fuackfocused | Handiwork / Transporting / WateringLevel 1 | Handiwork 1Transporting 1Watering 1 | Lead: Use Handiwork and Transporting and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Transporting and Watering at level 1; keep as a fallback only when the main lane is quiet. Check: If Handiwork and Transporting and Watering still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Fuddlerfocused | Handiwork / Mining / TransportingLevel 1 | Handiwork 1Mining 1Transporting 1 | Lead: Use Handiwork and Mining and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Mining and Transporting at level 1; keep as a fallback only when the main lane is quiet. Check: If Handiwork and Mining and Transporting still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Green Slimespecialist | TransportingLevel 1 | Transporting 1 | Lead: Assign Transporting when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for moving finished goods between the station and its destination; it has no lower-priority job to pull it away. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Gumossspecialist | PlantingLevel 1 | Planting 1 | Lead: Assign Planting when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for crop setup from seed placement through the next growth handoff; it has no lower-priority job to pull it away. Check: If Planting still stalls, check the plot has seed input, reachable space, and a connected watering route before replacing the Pal or raising its level. Next: Watch one planting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Herbilfocused | Gathering / Planting / TransportingLevel 1 | Gathering 1Planting 1Transporting 1 | Lead: Use Gathering and Planting and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Planting and Transporting at level 1; keep as a fallback only when the main lane is quiet. Check: If Gathering and Planting and Transporting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Hoocratesspecialist | GatheringLevel 1 | Gathering 1 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Hoodlefocused | Handiwork / TransportingLevel 1 | Handiwork 1Transporting 1 | Lead: Use Handiwork and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Transporting at level 1; keep as a fallback only when the main lane is quiet. Check: If Handiwork and Transporting still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Illuminant Batspecialist | GatheringLevel 1 | Gathering 1 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Illuminant Slimespecialist | TransportingLevel 1 | Transporting 1 | Lead: Assign Transporting when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for moving finished goods between the station and its destination; it has no lower-priority job to pull it away. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Jolthogspecialist | Generating ElectricityLevel 1 | Generating Electricity 1 | Lead: Assign Generating Electricity when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for generator uptime and the base power lane; it has no lower-priority job to pull it away. Check: If Generating Electricity still stalls, check the generator has its input and the powered facility is actually requesting energy before replacing the Pal or raising its level. Next: Watch one power demand cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Jolthog Crystspecialist | CoolingLevel 1 | Cooling 1 | Lead: Assign Cooling when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for cold-chain stations and temperature-sensitive output; it has no lower-priority job to pull it away. Check: If Cooling still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Kelpseafocused | Farming / WateringLevel 1 | Farming 1Watering 1 | Lead: Use Farming and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming and Watering at level 1; keep as a fallback only when the main lane is quiet. Check: If Farming and Watering still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Kelpsea Ignisfocused | Farming / KindlingLevel 1 | Farming 1Kindling 1 | Lead: Use Farming and Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming and Kindling at level 1; keep as a fallback only when the main lane is quiet. Check: If Farming and Kindling still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Kikitspecialist | MiningLevel 1 | Mining 1 | Lead: Assign Mining when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for ore or stone production at the measured resource lane; it has no lower-priority job to pull it away. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Lamballfocused | Farming / Handiwork / TransportingLevel 1 | Farming 1Handiwork 1Transporting 1 | Lead: Use Farming and Handiwork and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming and Handiwork and Transporting at level 1; keep as a fallback only when the main lane is quiet. Check: If Farming and Handiwork and Transporting still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Lifmunkflexible | Gathering / Handiwork / Lumbering / Medicine Production / PlantingLevel 1 | Gathering 1Handiwork 1Lumbering 1Medicine Production 1Planting 1 | Lead: Use Gathering and Handiwork and Lumbering and Medicine Production and Planting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Lumbering and Medicine Production and Planting at level 1; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork and Lumbering and Medicine Production and Planting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Maufocused | Farming / GatheringLevel 1 | Farming 1Gathering 1 | Lead: Use Farming and Gathering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming and Gathering at level 1; keep as a fallback only when the main lane is quiet. Check: If Farming and Gathering still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Mau Crystfocused | Cooling / FarmingLevel 1 | Cooling 1Farming 1 | Lead: Use Cooling and Farming as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Farming at level 1; keep as a fallback only when the main lane is quiet. Check: If Cooling and Farming still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Noxspecialist | GatheringLevel 1 | Gathering 1 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Pengulletflexible | Cooling / Handiwork / Transporting / WateringLevel 1 | Cooling 1Handiwork 1Transporting 1Watering 1 | Lead: Use Cooling and Handiwork and Transporting and Watering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Handiwork and Transporting and Watering at level 1; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Cooling and Handiwork and Transporting and Watering still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Pupperaifocused | Gathering / Lumbering / TransportingLevel 1 | Gathering 1Lumbering 1Transporting 1 | Lead: Use Gathering and Lumbering and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Lumbering and Transporting at level 1; keep as a fallback only when the main lane is quiet. Check: If Gathering and Lumbering and Transporting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Purple Slimespecialist | TransportingLevel 1 | Transporting 1 | Lead: Assign Transporting when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for moving finished goods between the station and its destination; it has no lower-priority job to pull it away. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Rainbow Slimespecialist | TransportingLevel 1 | Transporting 1 | Lead: Assign Transporting when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for moving finished goods between the station and its destination; it has no lower-priority job to pull it away. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Red Slimespecialist | TransportingLevel 1 | Transporting 1 | Lead: Assign Transporting when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for moving finished goods between the station and its destination; it has no lower-priority job to pull it away. Check: If Transporting still stalls, check there is a pickup, a reachable destination, and free storage at the end of the route before replacing the Pal or raising its level. Next: Watch one transport handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Ribbunyfocused | Gathering / Handiwork / TransportingLevel 1 | Gathering 1Handiwork 1Transporting 1 | Lead: Use Gathering and Handiwork and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Transporting at level 1; keep as a fallback only when the main lane is quiet. Check: If Gathering and Handiwork and Transporting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Roobyfocused | Farming / KindlingLevel 1 | Farming 1Kindling 1 | Lead: Use Farming and Kindling as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming and Kindling at level 1; keep as a fallback only when the main lane is quiet. Check: If Farming and Kindling still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Rushoarspecialist | MiningLevel 1 | Mining 1 | Lead: Assign Mining when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for ore or stone production at the measured resource lane; it has no lower-priority job to pull it away. Check: If Mining still stalls, check the resource node is reachable and storage can accept another load before replacing the Pal or raising its level. Next: Watch one mining handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Sparkitflexible | Farming / Generating Electricity / Handiwork / TransportingLevel 1 | Farming 1Generating Electricity 1Handiwork 1Transporting 1 | Lead: Use Farming and Generating Electricity and Handiwork and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming and Generating Electricity and Handiwork and Transporting at level 1; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Farming and Generating Electricity and Handiwork and Transporting still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Sweefocused | Cooling / GatheringLevel 1 | Cooling 1Gathering 1 | Lead: Use Cooling and Gathering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Cooling and Gathering at level 1; keep as a fallback only when the main lane is quiet. Check: If Cooling and Gathering still stalls, check the cooling station has an open path, a reachable input, and room for the finished output before replacing the Pal or raising its level. Next: Watch one cooling cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Tanzeeflexible | Gathering / Handiwork / Lumbering / Planting / TransportingLevel 1 | Gathering 1Handiwork 1Lumbering 1Planting 1Transporting 1 | Lead: Use Gathering and Handiwork and Lumbering and Planting and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Gathering and Handiwork and Lumbering and Planting and Transporting at level 1; this Pal covers 5 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Gathering and Handiwork and Lumbering and Planting and Transporting still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Tanzee Ignisflexible | Handiwork / Kindling / Lumbering / TransportingLevel 1 | Handiwork 1Kindling 1Lumbering 1Transporting 1 | Lead: Use Handiwork and Kindling and Lumbering and Transporting as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Handiwork and Kindling and Lumbering and Transporting at level 1; this Pal covers 4 lanes, so protect the chosen job with work priorities before expanding coverage. Check: If Handiwork and Kindling and Lumbering and Transporting still stalls, check materials arrive at the station and the output container is not full before replacing the Pal or raising its level. Next: Watch one crafting cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Teafantspecialist | WateringLevel 1 | Watering 1 | Lead: Assign Watering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for water-dependent production and the next crop or facility handoff; it has no lower-priority job to pull it away. Check: If Watering still stalls, check the water source, target station, and output route are all reachable before replacing the Pal or raising its level. Next: Watch one watering cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Tocotocospecialist | GatheringLevel 1 | Gathering 1 | Lead: Assign Gathering when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for gathering nodes and the first handoff back to storage; it has no lower-priority job to pull it away. Check: If Gathering still stalls, check the node is reachable and the gathered material has a valid destination before replacing the Pal or raising its level. Next: Watch one gathering handoff after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Vixyfocused | Farming / GatheringLevel 1 | Farming 1Gathering 1 | Lead: Use Farming and Gathering as the primary assignment, then restrict lower-priority jobs if the Pal wanders from the bottleneck. Plan: Lead with Farming and Gathering at level 1; keep as a fallback only when the main lane is quiet. Check: If Farming and Gathering still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Woolipopspecialist | FarmingLevel 1 | Farming 1 | Lead: Assign Farming when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for ranch output and a predictable collection loop; it has no lower-priority job to pull it away. Check: If Farming still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Woolipop Terraspecialist | FarmingLevel 1 | Farming 1 | Lead: Assign Farming when that station is the measured bottleneck. Plan: Single-lane plan: reserve this Pal for ranch output and a predictable collection loop; it has no lower-priority job to pull it away. Check: If Farming still stalls, check the ranch has the required feed, an accessible drop area, and a clear collection route before replacing the Pal or raising its level. Next: Watch one ranch collection cycle after the assignment change. If the first handoff completes, keep the rest of the base unchanged for the next test. |
Lower the minimum level or switch Worker style. A base can also fail because of paths, storage, inputs, food, rest, or power—not just Pal level.
Decision rule
Use the database to staff a measured bottleneck
- 1
Name the failed job. Choose Kindling, Mining, Transporting, or the exact station task that is not completing.
- 2
Compare verified base levels. A higher number narrows the shortlist; it does not prove better throughput in the current layout.
- 3
Check role breadth. Specialists switch less. Flexible Pals cover more jobs but may leave the priority lane unless preferences are constrained.
- 4
Run one full cycle. Watch inputs, travel, work, output storage, food, rest, and power before changing a second worker.
Share this guide
Send the answer when another player hits the same blocker.
Share the current Palworld route, or copy the link for Discord and group chat.
Player questions
Work Suitability FAQ
Use the current game panel before spending rare resources on a value that can change.
What does Palworld work efficiency mean?
The official base-job term is Work Suitability. Use the finder to compare verified job levels, then test one Pal through a complete production cycle because paths, inputs, output storage, food, rest, power, passives, facilities, settings, and task switching also affect real output.
How many Pals are in the Work Suitability database?
The current database contains 292 verified Pals and 747 Pal-to-job relations. Conflicting or unconfirmed relations remain outside the public table rather than being guessed into a result.
What is the difference between specialist and flexible Pals?
A specialist has one verified base job and is less likely to switch tasks. A flexible Pal covers four or more jobs but may need work preferences to protect the priority lane.
Why can a high-level Pal still stand idle?
Check whether the station has inputs, reachable space, output capacity, food, rest, power, and a valid assignment before replacing the Pal.
Are rank-up Work Suitability values included?
No. The public table shows the verified base level only; confirm rank, passives, and current live bonuses in the Pal screen.